Call 770-740-0400

Engineered Solutions
for an age-old problem

New Construction

new construction

NEW CONSTRUCTION

Atlas Piers of Atlanta can meet your needs for new construction projects. We are one of the only companies in the Southeast that provide a pre-engineered underpinning system that has been evaluated and listed by all national building code agencies. We can solve problems of building on fill soils, high water tables, expansive soils, unsuitable soils or where other obstacles prevent traditional foundation methods.

We will work alongside your architect or engineer to maximize pier spacing and performance. On typical reinforced footings or stem walls, new construction piers are placed every 8 to 10 feet on center. Spacing can vary depending on load requirements, footing reinforcement details and existing soil bearing capacity.

A crew with a skid loader or Mini-Excavator can place up to 50 anchors in less than one day. These piers are ready to be loaded immediately which can increase project timelines. Piers for these applications are generally rated for working loads of 10 to 20 tons.

Call our office today or contact us through our information sheet to find out more.